Everyone is familiar with the advantages of CFRP retrofitting. It has the characteristics of saving space, simple construction, easy construction quality assurance, basically no increase in structural size and weight, corrosion resistance, good durability and so on.
Everyone is familiar with the advantages of CFRP retrofitting. It has the characteristics of saving space, simple construction, easy construction quality assurance, basically no increase in structural size and weight, corrosion resistance, good durability and so on.
However, various problems and common quality problems will be encountered in the construction of carbon fiber wrap. How to prevent and deal with it? This article analyzes from the main reasons, prevention methods and treatment methods.
1. The surface plastering after CFRP retrofitting is affected.
The cement mortar layer is easy to fall off or the plastering operation cannot be performed.
main reason:
1. The cement mortar used for surface plastering has poor adhesion.
2. The surface of the carbon cloth is not roughened such as sanding.
Prevention method:
1. Select cement mortar with strong cohesive force. The mortar should be inspected on site. The wet-mixed mortar should be uniform in appearance without segregation and bleeding. The dry-mixed mortar in bulk should be uniform in appearance and free from clumping and moisture. The mortar should be completely packaged without moisture.
2. Before the dipping glue is cured, spray an appropriate amount of dry yellow sand on the outer surface of the carbon fiber.
2. Low bonding strength between carbon fiber and concrete base
main reason:
1. Reinforcement did not follow normal construction procedures and missed steps.
2. Improper sanding and cleaning of concrete surface.
3. The concrete surface is humid or the humidity in the air is high.
Prevention method:
1. Make technical explanations before construction to improve and standardize the skills of construction operators.
2. Repair and level the base surface first and then polish it. (Some areas with concave surfaces are prone to tensile stress after the carbon cloth is pasted, resulting in peeling.) Surface dust should be blown away.
3. The moisture content of the concrete base layer should not be greater than 4%, and should not be greater than 6% (the relevant moisture meter and other detection methods can be used). If the moisture content exceeds the limit, it can be dried by infrared irradiation or hot air. The humidity at the construction site is high. Ventilation and dehumidification should be performed to avoid large areas of wet work at the same time.
3. The adhesive is too thick for easy application
main reason:
1. During low temperature construction, epoxy resin is sensitive to temperature, and colloid thickening is normal.
Prevention method:
1. Before the construction process, heat the colloid with water bath heating.
2. Kappa customized (winter, low temperature) impregnated rubber products are selected, without heating the colloid to ensure normal construction.
คุณสามารถหาได้ทุกสิ่งที่คุณต้องการที่นี่ ไว้วางใจและลองใช้ผลิตภัณฑ์เหล่านี้ คุณจะพบความแตกต่างอย่างมากหลังจากนั้น
กาวคาร์บอนไฟเบอร์ชุบสารคุณภาพดีสำหรับใช้หุ้มด้วยโพลีเมอร์เสริมคาร์บอนไฟเบอร์ (CFRP) เพื่อเพิ่มความแข็งแรงให้กับโครงสร้าง
แถบ/แผ่นลามิเนต/แผ่นโพลีเมอร์เสริมคาร์บอนไฟเบอร์ที่มีความแข็งแรงสูง (CFRP) สำหรับการเสริมความแข็งแรงโครงสร้างและการซ่อมแซมคอนกรีต
ผ้าคาร์บอนไฟเบอร์ที่มีความแข็งแรงสูงทิศทางเดียวที่ผ่านการทำให้อิ่มตัวล่วงหน้าเพื่อสร้างผ้าโพลีเมอร์เสริมคาร์บอนไฟเบอร์ (CFRP) ซึ่งใช้สำหรับเสริมความแข็งแรงให้กับองค์ประกอบคอนกรีตโครงสร้าง