Preventive measure of structural strengthening

Preventive measure of structural strengthening: CFRP strengthening, steel plate strengthening, post installed anchoring.


Preventive measure of structural strengthening


Item

Common problems

Preventive measure
Post installed anchor

The glue is not full enough; the distance between the steel bar and the hole wall is uneven

Glue injecting gun is used to post installed anchor, and two times correction is made after steel bar is implanted. The length of exposed steel bar is reasonably reserved, and the difficulty of planting bar is reduced.
Externally bonded CFRP wrapThe bond is not firm; carbon fiber cloth is not soaked; hollowing, etc.

Strengthen the grinding of the base and brush the primer glue.

The carbon fiber cloth is soaked with carbon fiber adhesive glue and then paste.

Roll along the same direction, carbon fiber selvage suitable for more glue.

Pate steel plate

Hollowing

The steel plate and the concrete surface are evenly coated with steel plate adhesive.

Strictly control the thickness of the steel plate glue.

Pressure perfusion glue is used for construction.


ผลิตภัณฑ์ที่แนะนำโดย Horse Construction

คุณสามารถหาได้ทุกสิ่งที่คุณต้องการที่นี่ ไว้วางใจและลองใช้ผลิตภัณฑ์เหล่านี้ คุณจะพบความแตกต่างอย่างมากหลังจากนั้น

HM-20 เส้นใยคาร์บอนแบบผืน

คาร์บอนไฟเบอร์ของ Horse Construction เหมาะสำหรับการเสริมแรงโครงสร้าง การซ่อมแซม และปรับปรุงพื้นผิวคอนกรีต ก่ออิฐ เหล็ก และไม้บนอาคาร สะพาน ทางหลวง ทางรถไฟ อุโมงค์ ท่าเทียบเรือ และสนามบินพลเรือน

เพิ่มเติม >

แผ่นเหล็กยึดติดอีพ็อกซี HM-120

กาวยึดติดแผ่นเหล็กโครงสร้าง HM-120 เป็นผลิตภัณฑ์อีพ็อกซีสองส่วนที่มีการยึดเกาะที่แข็งแรง บ่มที่อุณหภูมิห้อง มีคุณสมบัติป้องกันการเสื่อมสภาพ ทนต่อแรงกระแทกได้ดีเยี่ยม ทั้งการยึดติดด้วยตนเองและการยึดติดร่วมกันของเหล็กและคอนกรีต โดยมีอัตราการเฉือนสูง ใช้สำหรั

เพิ่มเติม >

Back
Top
Close